For those of you up North in the cold. I'm always amazed the color of the ocean in Barra. Only occasionally do you see this in Melaque.
Showing posts with label beach. Show all posts
Showing posts with label beach. Show all posts
Tuesday, March 01, 2016
Wednesday, February 03, 2016
Fixing the Malecon but not the beach
A rather large section of the Malecon washed away during Hurricane Patricia. That section was just over that small wall and it took a lot of the bricks out in the pedestrian area. It's been extended at least 5 meters beyond where it was before.
The beach remains a mess but at least the buildings are protected with the rocks. The blue water in Barra always amazes me compared to Melaque.
Labels:
Barra,
beach,
Hurricane Patricia,
Malecon
Monday, November 16, 2015
Barra beach - not a beach
This is really sad compared to what used to be a very pretty and user friendly beach. I think the dredge is still there so maybe they'll cover it with sand once again.
Wednesday, October 28, 2015
Barra waterfront after
The beach is extremely ugly but for the most part the rocks protected the buildings. The statue on the malecon is leaning a bit and there is rumor of a beach side pool cracking. My guess is it's the Alondra pool because it's closest to the beach and more likely to have an undercut foundation.
Ugly beach
Careful
Sunday, October 04, 2015
Start of the cross bay swim
Leaving Barra de Navidad beach
The only good foto I found and no results posted anywhere. The post below this is the notice for Saturday morning
Labels:
Barra de Navidad,
beach,
swim
Friday, October 02, 2015
Swim across the bay from Barra to Melaque
Got lots of energy? Be on the beach in Barra tomorrow morning at 8 AM. I think I've seen a video of the finish line in West Melaque but that's all
6th annual swim from Barra de Navidad to Melaque - Oct. 3rd
Thursday, October 01, 2015
A Barra visit
I had to go over to Barra de Navidad yesterday afternoon to meet with Libra Construction about drawing up plans for a construction project in Melaque I'm working on. They are located next to the ETN Bus station at the entrance to Barra on Veracruz.
Since I don't get over to Barra often I had to take a look at the beach. It's not sandy like may have been planned but the rocks look very solid preventing any erosion up to the buildings. Hurricane season isn't over till the end of November so for two more months there's still a chance. We'v been lucky with pretty calm weather so far this year.
Looks solid
A grey sunset
Glen's street
Labels:
Barra,
Barra de Navidad,
beach,
ETN,
hurricane,
Libra Construction,
rocks,
season
Tuesday, September 22, 2015
Sunday, September 13, 2015
Barra de Navidad Malecon
7AM in the morning
Even though there is almost no beach left along this section .... the Malecon is still attractive. If we have a hurricane and nothing has been done the Malecon may be at risk.
Labels:
Barra de Navidad,
beach,
Malecon
Thursday, September 10, 2015
Barra beach looking pretty sick
I haven't been over there in awhile so I don't know how it is with the rocks in front of the buildings but this section without any rocks is just about gone. I assume the rocks are doing pretty well but then we haven't had any storms lately
Labels:
Barra,
beach,
pretty sick,
rocks
Monday, June 29, 2015
Saturday, February 14, 2015
Friday, February 06, 2015
Fortress Barra de Navidad
Foto - Jack Brock
Even though it looks like they are building a wall around Barra, this is just sand dredged out of the lagoon behind and eventually will be spread down the beach where needed. Probably to be washed away next summer.
Wednesday, December 31, 2014
Tuesday, November 25, 2014
Some nice Barra beach pictures
A couple of very nice Barra de Navidad beach pictures
These were posted on TomZap a few days ago and are very recent
Looking toward Barra Lagoon
Looking toward Melaque
Labels:
Barra,
Barra de Navidad,
beach,
pictures
Friday, October 03, 2014
Break water or a beach
Well, all the sand is gone but at least the buildings aren't falling into the ocean. Storm after storm this year has been hard on the rebuilt beach. Don't know if they will bring in more sand for the tourist season.That's a lot of work only to have it wash away every year.
Barra de Navidad Beach
Labels:
Barra de Navidad,
beach,
break water,
sand,
storm
Thursday, May 15, 2014
Big changes and hopes for Barra beach
The changes and additional sand does seem remarkable .... especially after another few days of large swells a week ago. It seems this dredge pumping sand from the lagoon to the beach can work 24 hours a day and is bound to make some progress with the amount of sand in front of Barra. There is also the unknown bulkhead and the reef bags just off shore that are contributing to this in their own way
A foto worth sharing from Jack Brock
Then we have this very idealistic video done about everyone contributing their little piece of sand to the project. Was this done before or after ..... I don't know. Probably before but great karma and feeling in this Barra community "rebuild our beach project". Very artistic and maybe indirectly influenced the outcome.
Friend Glenn can be seen a number of times in this video.
Don't think he carried a bucket but heart was in the right place
Labels:
Barra,
beach,
dredge,
idealistic video,
progress
Monday, April 07, 2014
No beach for Semana Santa
Not quite sure where foto was taken
I assume this means all of the central beach, the malecon and the lagoon beach will be closed as it has been for the last month. I see no way Uretek can pack up all it's equipment and take a two week break. Barra has to think long term and look beyond this one.
No beach ready for EasterMayor JesĆŗs Huerta Aguilar admitted to CANAL235.COM, which will not be ready the artificial beach in Barra de Navidad, for the holiday season of Easter and Passover; Uretek businessman, Francisco Alvarez had anticipated it would be ready by that date.Since the end of 2013 work to revive the beach in Barra de Navidad and dredge the lagoon which connects the bay has caused the closure of roads to motorists, further impacting on the provision of tourism services.With support from federal and state government resources for the sum of $ 166 million invested, however, the delay in the works, apparently not allow vacationers will enjoy the new beach next holiday period.Notably, the Secretary of Tourism of Jalisco promotes Costalegre area, especially the fate of Barra de Navidad, where free travel arrived in Holy Week and Easter. (April 6, 2014)
Labels:
Barra de Navidad,
beach,
Easter,
no beach,
Semana Santa,
work
Saturday, March 29, 2014
Barra beach restoration includes a Malecon
Finally spent a couple hours looking at the new construction along the waterfront in Barra. The most impressive part is the foundation for a new Malecon all along water front. It looks to be 20-30 meters beyond the high water mark in the Sea Masters area which you can see with their elevated porches. Probably have to tear those decks down and start again on a new surface. The hotel Tropical has solid pilings but no sand under the first 5-6 meters of the building. Not too many entrance points to the beach so it looks like the shovel is moving rocks and dirt up and down the beach from there (Sea Masters).
The two reefs which you can almost see in the long beach shot look to be done but there were 2 guys in dive suits doing something on them. The idea of the reefs was to fill very large and long bags full of sand and use them almost as a breakwater to defuse normal wave action.
Looks to be be 2-3 sets of hoses heading in the ocean direction but on the ocean side you can only see the one from the dredge. The large dredge hose seems to be relying on water action to disperse the sand. I wonder if the smaller ones were/are being used to fill the "reef bags". The Malecon is closed to everyone that does not work there ... looks like it may be for awhile.
Pardon the large smudge on my camera lens - didn't check !!
Pardon the large smudge on my camera lens - didn't check !!
Shovel next to Sea Master
Sea Masters
Malecon foundation and two reefs
Sand into the ocean
Dredge barge and smaller hoses
Labels:
Barra,
beach,
breakwater,
Malecon,
reef,
restoration,
Sea Master,
Shovel
Wednesday, March 12, 2014
Mysterious Barra waterfront work
They have been working on the Barra de Navidad beach and waterfront improvements for several weeks with all kinds of large equipment and huge plans but nobody seems to be interested in posting pictures or progress of the project. I can't believe it's not interesting ... but only imagine not much is getting done for some reason. I've only heard of vague street closures and someone recently posted this foto of the Malecon entrance. Wish I had more time to get over there.
Barra de Navidad malecon closed
Labels:
Barra,
Barra de Navidad,
beach,
Malecon,
Mysterious,
project,
waterfront,
work
Subscribe to:
Posts (Atom)