This project is in two segments that are embedded 3.5 meters deep into the seabed, and rise to the level of low water so when low-tide arrives they will be seen. The first section would be one hundred meters long and 50 meters from the pier. The second, 300 meters from the jetty and a length of 60 meters. The separation between the two is 60 meters. They would both be 70 meters from the beach. The breakwaters would be of geobags which are made of geotextile filled with sand.
“Estructura de emergencia” detiene erosión de línea costera
0 comments:
Post a Comment